UpcomingSportDesign and initial site works

National Aquatic Centre

The National Aquatic Centre is a new aquatic venue planned beside the heritage-listed Centenary Pool in Victoria Park, Spring Hill, designed by ARM Architecture, NH Architecture, and Arkhefield. It will host swimming, diving, water polo, and artistic swimming at the 2032 Olympic and Paralympic Games, with three new covered pools, a main and secondary arena, and 8,000 permanent legacy seats expandable to 25,000.

Aerial photo of the site of National Aquatic Centre, in Spring Hill, Brisbane
Aerial photo, 2022. © State of Queensland

Spring Hill, BrisbaneSouth East Queensland

Contracts awarded

None yet

Design and initial site works

Builder

Not announced

The builder is not chosen yet.

Government client

GIICA

Games Independent Infrastructure and Coordination Authority

Status

Upcoming

Next step: 2027

Timeline

  1. February 2026Builder prequalification calledDone
  2. 23 July 2026Principal Architects appointedDone
  3. 1 September 2026GIICA takes possession of the siteDone
  4. November 2026Geotechnical borehole and footpath initial worksOn now
  5. 2027Early works and construction startNext
  6. 2032Hosts the Olympic and Paralympic GamesLater

What is being built

GIICA took possession on 1 September 2026 and is carrying out structural surveys, borehole drilling, and footpath works in November 2026 while main builder procurement continues.

  • Main arena and secondary arena, each with large indoor pools
  • Three new covered competition pools
  • Legacy capacity of 8,000 seats
  • Temporary seating to lift capacity to up to 25,000 for the Games
  • Gym, high-performance rooms, and administration spaces
  • Multi-storey building tiered down the southern ridge with rippled floating roof
Show all 9
  • Open central concourse and breezeway connecting towards Brisbane Stadium
  • Refurbishment of the heritage-listed Centenary Pool complex and its three outdoor pools
  • Initial works continuing in November 2026: structural surveys, utility checks, borehole drilling, and Gregory Terrace footpath works

Where it is

Centenary Pool site, Victoria Park, Spring Hill, South East Queensland

Barlow Park Stadium upgradeMoreton Bay Indoor Sports CentreQueensland Academy for Health Sciences, RockhamptonCooktown Multipurpose Health Service redevelopmentPCYC PimpamaTownsville Correctional Centre Capacity UpliftNew Toowoomba HospitalIpswich Hospital Expansion Stage 2Logan Hospital Expansion Stage 2Corymbia Reserve State High School and Ridgeview Special SchoolNorth Queensland StadiumLockyer Valley Correctional CentreCairns Convention Centre Expansion and RefurbishmentRoma Hospital RedevelopmentFortitude Valley State Secondary CollegeBrisbane StadiumNational Aquatic CentreCross River RailSydney Metro WestSydney Metro Western Sydney AirportWestern Harbour TunnelParramatta Light Rail Stage 2Suburban Rail Loop EastNorth East LinkMelbourne Airport RailSubmarine Rotational Force West Priority Works, HMAS StirlingHenderson Defence PrecinctRAAF Base Tindal Redevelopment Stage 6 and airfield worksOsborne Submarine Construction YardSnowy 2.0Inland RailNewcastle to Sydney High Speed RailMarinus Link Stage 1Australian War Memorial Development ProjectTorrens to Darlington (T2D)Anna Meares Velodrome upgradeBrisbane Aquatic Centre upgradeBrisbane International Shooting Centre upgradeBrisbane SX International BMX Centre upgradeChandler Sports Precinct upgradeLogan Indoor Sports CentrePara Sport FacilityQueensland Tennis Centre upgradeRedland Whitewater CentreRockhampton Flatwater FacilitySunshine Coast Mountain Bike CentreSunshine Coast Stadium upgradeToowoomba Showgrounds upgrade
UpcomingCurrentCompleted

Supplying this project

How to get in

GIICA advertises its open tenders, expressions of interest, and registrations of interest on QTenders via VendorPanel, and does not keep a general supplier register. Builder selection continues toward 2027 construction, and GIICA is covering upcoming packages at its 4 December 2026 Industry Update webinar (RSVP by 2 December 2026).

GIICA procurement page

The rules

Queensland Procurement Policy 2026 applies. How QPP 2026 works

No targets published yet. The tender documents set them.

Your supply chain brought to Birak

Bring along suppliers you already use if they are not already on the Birak Marketplace. There are no onboarding fees and generally most suppliers can have an e-store on the Birak Marketplace.

Bring your own suppliers

Your supply chain, as stores on Birak

Keep the suppliers you already use. We set each one up as a store on Birak, so your Indigenous spend and your procurement sit in one place.

  1. 1Send us your suppliersList them, with a contact at each.
  2. 2We set up their storesEach one goes on Birak with the products you buy from it.
  3. 4Order as you do nowEvery order carries BRK-PSD8ZB and its compliance documents.

Optional: one trade account puts every store on credit. Apply for 30-day credit terms

Common questions

Answered from the sources below, as checked on 18 November 2026.

Who is building National Aquatic Centre?
No builder is named yet. The project's stage is: Design and initial site works.
What is the timeline for National Aquatic Centre?
Builder prequalification called: February 2026. Principal Architects appointed: 23 July 2026. GIICA takes possession of the site: 1 September 2026. Geotechnical borehole and footpath initial works: November 2026. Early works and construction start: 2027. Hosts the Olympic and Paralympic Games: 2032.
How do suppliers and subcontractors get work on National Aquatic Centre?
GIICA advertises its open tenders, expressions of interest, and registrations of interest on QTenders via VendorPanel, and does not keep a general supplier register. Builder selection continues toward 2027 construction, and GIICA is covering upcoming packages at its 4 December 2026 Industry Update webinar (RSVP by 2 December 2026).

Supplying this job?

Send your plans or a list. The Project ID goes with your quote, so we match it to the job.

CallGet a quote

Set your delivery site

We deliver Australia-wide. Your site goes with your quote request, and freight is quoted with your order.