Call us 1300 866 089Quote list

CompletedJusticeOpened in September 2025

Lockyer Valley Correctional Centre

Lockyer Valley Correctional Centre is a 1,536-bed high security prison at Spring Creek, about 12 kilometres north-east of Gatton. It was built as Stage 2 of the Southern Queensland Correctional Precinct.

Aerial photo of the site of Lockyer Valley Correctional Centre, in Spring Creek, Gatton
Aerial photo, 2021. © State of Queensland

Spring Creek, GattonSouth East Queensland

Contracts awarded

$901m

1 contract awarded by QCS.

Published budget: $861 million, as stated in July 2022 after a 500-bed increase

Built by

John Holland

Main works contractor

Government client

QCS

Queensland Corrective Services

Status

Finished

September 2025

Contracts awarded

$901m in 1 contract, awarded by QCS

  1. Managing contractor, two stage design and construction management

    John Holland Queensland P/L, awarded September 2020

    $901m

    $901,333,159, Queensland Government contract disclosure report for the 2025 financial year, entry dated 4 October 2024. This is the value as later recorded, not the value at award. Source

Timeline

  1. 4 March 2021First sod turnedDone
  2. July 2022Beds increased to more than 1,500Done
  3. February 2024All building shells completeDone
  4. 25 July 2025Commissioning startedDone
  5. September 2025OpenedDone

What was built

The site has 33 buildings connected by walkways inside a secure perimeter fence.

  • 1,536 beds
  • 33 buildings connected by walkways
  • Building services network across the site
  • More than 11 kilometres of fencing, 34 kilometres of razor wire, and 1,830 secure doors
  • About 30,000 cubic metres of concrete
  • Car parking, external landscaping, and finishes
Show all 7
  • Site of about 220,000 square metres

Where it is

Millers Road, Spring Creek QLD 4343, South East Queensland

Barlow Park Stadium upgradeMoreton Bay Indoor Sports CentreQueensland Academy for Health Sciences, RockhamptonCooktown Multipurpose Health Service redevelopmentPCYC PimpamaTownsville Correctional Centre Capacity UpliftNew Toowoomba HospitalIpswich Hospital Expansion Stage 2Logan Hospital Expansion Stage 2Corymbia Reserve State High School and Ridgeview Special SchoolNorth Queensland StadiumLockyer Valley Correctional CentreCairns Convention Centre Expansion and RefurbishmentRoma Hospital RedevelopmentFortitude Valley State Secondary CollegeBrisbane StadiumNational Aquatic CentreCross River RailSydney Metro WestSydney Metro Western Sydney AirportWestern Harbour TunnelParramatta Light Rail Stage 2Suburban Rail Loop EastNorth East LinkMelbourne Airport RailSubmarine Rotational Force West Priority Works, HMAS StirlingHenderson Defence PrecinctRAAF Base Tindal Redevelopment Stage 6 and airfield worksOsborne Submarine Construction YardSnowy 2.0Inland RailNewcastle to Sydney High Speed RailMarinus Link Stage 1Australian War Memorial Development ProjectTorrens to Darlington (T2D)Anna Meares Velodrome upgradeBrisbane Aquatic Centre upgradeBrisbane International Shooting Centre upgradeBrisbane SX International BMX Centre upgradeChandler Sports Precinct upgradeLogan Indoor Sports CentrePara Sport FacilityQueensland Tennis Centre upgradeRedland Whitewater CentreRockhampton Flatwater FacilitySunshine Coast Mountain Bike CentreSunshine Coast Stadium upgradeToowoomba Showgrounds upgrade
UpcomingCurrentCompleted

How it was procured

The rules

It was procured under its government's rules of the time. Today's rules: how QPP 2026 works.

No targets or results were published for this project.

Your supply chain brought to Birak

Bring along suppliers you already use if they are not already on the Birak Marketplace. There are no onboarding fees and generally most suppliers can have an e-store on the Birak Marketplace.

Bring your own suppliers

Your supply chain, as stores on Birak

Keep the suppliers you already use. We set each one up as a store on Birak, so your Indigenous spend and your procurement sit in one place.

  1. 1Send us your suppliersList them, with a contact at each.
  2. 2We set up their storesEach one goes on Birak with the products you buy from it.
  3. 4Order as you do nowEvery order carries the job's Project ID and its compliance documents.

Optional: one trade account puts every store on credit. Apply for 30-day credit terms

Common questions

Answered from the sources below, as checked on 11 November 2026.

Who built Lockyer Valley Correctional Centre?
John Holland. Main works contractor.
What were the contracts for Lockyer Valley Correctional Centre worth?
Managing contractor, two stage design and construction management, John Holland Queensland P/L: $901,333,159, Queensland Government contract disclosure report for the 2025 financial year, entry dated 4 October 2024. This is the value as later recorded, not the value at award.
What was the budget for Lockyer Valley Correctional Centre?
$861 million, as stated in July 2022 after a 500-bed increase.
What is the timeline for Lockyer Valley Correctional Centre?
First sod turned: 4 March 2021. Beds increased to more than 1,500: July 2022. All building shells complete: February 2024. Commissioning started: 25 July 2025. Opened: September 2025.
  • UpcomingCommunity

    PCYC Pimpama

    Pimpama, Gold Coast

    Queensland Government, in partnership with the City of Gold Coast

    Detailed design and approvals

Building something like it?

Send your plans or a list. The Project ID goes with your quote, so we match it to the job.

CallGet a quote

Set your delivery site

We deliver Australia-wide. Your site goes with your quote request, and freight is quoted with your order.